Skip to content
Factory-direct supply with warehouse routing across China, the USA and Canada. View offers & order

Custom Label & Cap Customization

WBS offers practical customization services for peptide kit presentation, including custom labels, standard cap selection, and fully custom caps. The options below help customers plan order quantity, production cost, lead time, and artwork feasibility before placing an order.

Customization options at a glance

1. Custom labels

Custom labels are suitable for customers who need project-specific product identification, brand presentation, QR code tracking, or batch information on the kit label.

  • MOQ per item: 10 kits
  • Unit cost: $3 per kit
  • Lead time: 7 days
  • Label size limit: maximum height 20mm, maximum width 50mm
  • Readability requirements: minimum font height โ‰ฅ1mm, QR code size โ‰ฅ5mm

2. Select standard caps

Standard cap selection is the most cost-efficient option when customers can use available cap styles and colors. It keeps the packaging consistent while avoiding custom tooling or additional unit cost.

  • MOQ per item: 200 kits
  • Unit cost: $0 per kit
  • Lead time: 7 days

3. Custom caps

Custom caps are recommended for customers who need a more distinctive kit appearance or a stronger brand presentation across larger batches.

  • MOQ per item: 100 kits
  • Unit cost: $5 per kit
  • Lead time: 10 days

How to choose the right option

Small batch or trial order

Choose custom labels. The MOQ starts from 10 kits per item and supports flexible project information.

Cost-controlled standard batch

Choose standard caps when the available cap options meet your packaging needs.

Brand-focused batch

Choose custom caps when cap appearance is part of the customer-facing presentation.

Artwork and production notes

For custom labels, please prepare label artwork within the maximum 20mm height and 50mm width limit. To keep the label readable, text should remain at least 1mm high and any QR code should be at least 5mm. Final feasibility is confirmed after reviewing the artwork, selected container, and cap option.

Lead time starts after artwork confirmation and customization details are approved. Shipping time is not included in the production lead time.